| Sr.# | Project Title | IPMT | Client |
|---|---|---|---|
| 41 | TS2 IMPROVEMENT OF WATER PARK UTILITIES. (Construction of Valve Chamber, Pump foundation). | Royal Commission- AL Jubail | China Harbour Engineering Arabia Co. Ltd |
| 42 | TS-1 IMPROVEMENT OF WATER PARK UTILITIES. (Site Preparation works, Road Turning line concrete & Asphalt Road works) | Royal Commission- AL Jubail | China Harbour Engineering Arabia Co. Ltd |
| 43 | INSTALLATION OF CHAIN LINK FENCE AT NAVY AIRPORT. (Site Preparation works Installation of Chain link fence at Navy Airport Al Jubail – 6.2km). | Royal Commission- AL Jubail | China Harbour Engineering Arabia Co. Ltd |
| 44 | CIVIL WORK UNDER HIGH PRESSURE LINE AREA NAVY AIRPORT. (Construction of OVERSIDE DRAIN, Gravel and AEP work). | Royal Commission- AL Jubail | China Harbour Engineering Arabia Co. Ltd |
| 45 | CIVIL WORKS AT TS4 AT NAVY AIRPORT. (Concrete curb, Grout works, AEP, Concrete Foundation works). | Royal Commission- AL Jubail | China Harbour Engineering Arabia Co. Ltd |
| 46 | ROADS DRAINAGE IMPROVEMENTS TS1, TS4 & TS6. (Site Preparation works Construction of Head Wall, End wall, Pipe connection with water channel, over side drain, water drain channel, thrust blocks, duck bank, rip rap, AEP works). | Royal Commission- AL Jubail | China Harbour Engineering Arabia Co. Ltd |
| 47 | RENOVATION OF FOUNDATION WORKS. (Renovation of machine & pump foundation). | Arcelor Mittal Al Jubail. | Arcelor Mittal Al Jubail. |
| 48 | ROADS DRAINAGE IMPROVEMENTS TS (Construction of valve chamber- 7 nos). | Royal Commission- AL Jubail | China Harbour Engineering Arabia Co. Ltd |