Sr.# Project Title IPMT Client
21 Eastern Petrochemical Company – Sharq (Underground Tank & Road, Paving Work) SABIC National Blue Corp.
22 Saline Water Conversion Corporation (SWCC) (Renovation& Protective Coating of Intake 11,12,13,14 Foundation) Saline Water Conversion Corporation (SWCC) Wetico water & Environment
23 JUBAIL CHEMICAL STORAGE & SERVICE COMPANY (JCSSC) (Cage Binding & Pile pouring) SABIC M.R. Al Khathlan Co. for Contracting /Gambit
24 FADHILI GAS PROGRAMME PROJECT(FGP) (Security Fence Chain-link Fence) Saudi Aramco  SUNGCHANG & ABDULLA AL SHAIKH CONTRACTING CO LTD
25 SAUDI ELASTOEMERS PROJECT. (Protective Coating Concrete Dike Wall, Paving Floor, Foundations). SABIC & KEMYA DALIEM & KIL JING KANG PARTNER
26 SAUDI ELASTOEMERS PROJECT. (Warehouse roof Protective Coating& Waterproofing) SABIC & KEMYA DALIEM & HASSAN ALLAM CONSTRUCTION.
27 National Environmental Preservation Co. (BeeA`h) (MCC Building from Foundation till Completion) BeeA`h Montair Process Technology
28 WASIT GAS PLANT (Site Preparation works UG Tank, Equipment Foundation Chemical Coating, Fabrication & Installation of Equipment Foundation) Saudi Aramco Gulf Pipe Supply/NBC
29 FADHILI GAS PROGRAMME PROJECT (FGP) D-43 AREA (Concrete Paving Light & Heavy Duty) Saudi Aramco  TECNICAS REUNIDAS & KIL JING KANG PARTNER
30 SAUDI ELASTOEMERS PROJECT. (Installation of Chain-link Fence) SABIC & KEMYA DALIEM & KIL JING KANG PARTNER
31 FADHILI GAS PROGRAMME PROJECT (FGP) D-43 & D-46 AREA (U-Ditch Work, Manhole, Trench Pedestal) Saudi Aramco  TECNICAS REUNIDAS & KIL JING KANG PARTNER
32 FADHILI GAS PROGRAMME PROJECT (FGP) D-46 AREA (Coating APCS-2E & APCS-1B Cooling Tower Internal & External Surface) Saudi Aramco  TECNICAS REUNIDAS &KIL JING KANG
33 FADHILI GAS PROGRAMME PROJECT (FGP) D-46& STP AREA (Fabrication &Installation of Pipe sleepers, HVAC foundation, Transformer Foundation, Lift Foundation & LCS Foundation) Saudi Aramco  TECNICAS REUNIDAS & KIL JING KANG PARTNER
34 FADHILI GAS PROGRAMME PROJECT (FGP) D-42 AREA (Protective Coating Equipment Foundation & Dike Wall) Saudi Aramco  TECNICAS REUNIDAS & KIL JING KANG PARTNER
35 RENOVATION OF BRIDGE T-103 (Milling & Replacement of Asphalt, Painting Bridge Deck Surface, Replacement of Light Pole, Improvement of Slope Stability Installation of Scupper and Upvc Pipes) Royal Commission- AL Jubail China Harbour Engineering Arabia Co. Ltd
36 ROADS DRAINAGE IMPROVEMENTS T-6 JALMUDAH (End wall, Pipe connection with water channel, Over side drain, water drain channel, Thrust blocks,duckbank, rip rap). Royal Commission- AL Jubail China Harbour Engineering Arabia Co. Ltd
37 FADHILI GAS PROGRAMME PROJECT (FGP) TRAIN-4 (Concrete paving, Pump foundation, Cable trench, Catch basin, Man hole, Pits, CTS & SPS Foundation). Saudi Aramco  TECNICAS REUNIDAS & KIL JING KANG PARTNER
38 TS2 IMPROVEMENT OF WATER PARK UTILITIES. (Site Preparation works Stamped Concrete, Electrical duck bank & Foundations works). Royal Commission- AL Jubail China Harbour Engineering Arabia Co. Ltd
39 TS1 CABLE MEDIAN BARRIER WORKS. (Installation of cable median barrier at TS-1 highway from Madina Bridge to Masjid Road Bridge- 16.5km). Royal Commission- AL Jubail China Harbour Engineering Arabia Co. Ltd
40 ROADS DRAINAGE IMPROVEMENTS T-6 JALMUDAH (End wall, Pipe connection with water channel, Over side drain, water drain channel, Thrust blocks, duck bank, rip). Royal Commission- AL Jubail China Harbour Engineering Arabia Co. Ltd